Elmeck Wires & Cables

Trusted manufacturer of ISI-certified copper and aluminium wires, delivering safety and performance across India.

ISI Certified Manufacturer

Company

  • Home
  • About Us
  • Products
  • Blog
  • Contact Us

Contact

  • Phone

    +91 93111 52255
  • Email

    [email protected]

Registered Office

Street No. 8, 458–466,
Friends Colony, Jhilmil Colony,
Delhi – 110095

View on Google Maps →

© 2026 Elmeck Wires & Cables. All rights reserved.

Designed for reliability & compliance

Cable sizing for a home circuit is relatively straightforward: look up the current, pick a wire size from a table, and you are done. Industrial cable sizing is a different discipline entirely. Multiple cables run in the same conduit or tray, ambient temperatures in factories often exceed 40°C, motors draw 5–7 times their running current at startup, and fault levels are high enough to cause serious damage if cables are undersized.

This guide covers the complete process for sizing cables for industrial three-phase loads — from calculating full load current through derating factors, voltage drop, and protection coordination.

Step 1 — Calculate Full Load Current

For three-phase motors and other three-phase loads, full load current (FLC) is calculated from the rated power, supply voltage, power factor, and efficiency:

FLC (A) = P ÷ (√3 × V × pf × η)

P = rated power in watts

V = line voltage (typically 415V in India)

pf = power factor (use 0.85 if not on nameplate)

η = motor efficiency (use 0.90 for standard motors if not specified)

Example: 7.5kW three-phase motor, 415V, pf = 0.85, η = 0.90

FLC = 7500 ÷ (1.732 × 415 × 0.85 × 0.90)

FLC = 7500 ÷ 549.7 = 13.6A

Always read the actual nameplate FLC and use it in preference to calculation

For non-motor loads (heaters, lighting panels, UPS feeds), simply use the actual measured or specified load current.

Step 2 — Apply Derating Factors

Cable current ratings published in IS 3961 (Part V for PVC insulated cables) are based on a reference ambient temperature of 30°C and cables installed in free air without adjacent cables. Industrial conditions almost always deviate from these assumptions, requiring derating.

Temperature correction factors (for PVC insulated cable rated at 70°C):

30°C ambient: factor = 1.00 (reference — no derating needed)

35°C ambient: factor = 0.94

40°C ambient: factor = 0.87

45°C ambient: factor = 0.79

50°C ambient: factor = 0.71

55°C ambient: factor = 0.61

Grouping factors (for cables in the same conduit, tray, or duct):

1 circuit (reference): factor = 1.00

2 circuits: factor = 0.80

3 circuits: factor = 0.70

4–5 circuits: factor = 0.65

6–7 circuits: factor = 0.60

8–9 circuits: factor = 0.52

Apply all relevant factors by multiplying them together. The required cable current rating in free air is then: Required rating = FLC ÷ Combined derating factor.

Worked Example — 7.5kW Motor in a Factory

Scenario: 7.5kW three-phase motor in a factory with 45°C ambient temperature. The cable runs in a conduit with two other motor cables (3 circuits total in conduit). PVC insulated copper cable.

Step 1 — FLC = 13.6A (from calculation above)

Step 2 — Temperature derating at 45°C: 0.79

Step 2 — Grouping derating for 3 circuits in conduit: 0.70

Step 2 — Combined derating: 0.79 × 0.70 = 0.553

Step 3 — Required free-air rating: 13.6 ÷ 0.553 = 24.6A

Step 4 — IS 3961 ratings (PVC copper, free air): 2.5mm² = 21A, 4mm² = 28A

Select 4mm² copper: derated rating = 28 × 0.553 = 15.5A > 13.6A ✓

Verify 6mm² not needed: 4mm² gives 15.5A derated, FLC is 13.6A — margin = 14% ✓

Result: 4mm² PVC copper cable is correct for this installation. Note that selecting by free-air rating alone (2.5mm² = 21A > 13.6A) would have resulted in a 2.5mm² cable that is actually only capable of carrying 11.6A derated — less than the motor FLC of 13.6A. This is a thermal overload risk.

Step 3 — Motor Starting Current Consideration

Standard induction motors draw 5–7 times their full load current during direct-on-line (DOL) starting. A 13.6A motor may draw 68–95A for 2–8 seconds at startup. This does not require the cable to be upsized for this current — the thermal mass of the cable is sufficient to handle this brief surge — but it does have two important implications.

Protection device must not trip on starting current — use motor-rated MCBs (Type D or motor protection switches), not standard Type B or Type C MCBs

Voltage drop during starting must be checked — excessive starting voltage drop prevents the motor from reaching running speed (see voltage drop calculation guide)

Soft starters and variable frequency drives (VFDs) limit starting current — if used, DOL starting current rules do not apply

Cable thermal withstand for starting is not a concern for cables sized for running current — the short duration of starting current is within cable thermal limits

Step 4 — Verify Voltage Drop

Once the cable size is selected from thermal considerations, verify that the voltage drop is within IS 732 limits (5% for power circuits). Use the formula from the voltage drop calculation guide. If the run is long (typically over 50 metres for smaller cables), voltage drop often governs the cable size rather than current carrying capacity — and the cable may need to be upsized further.

Step 5 — Protection Coordination

The selected cable must be properly protected by the upstream device. In India, industrial circuits are typically protected by:

Motor protection switch (MPS): adjustable current setting, built-in overload and short-circuit protection — preferred for motors

MCCB (Moulded Case Circuit Breaker) with thermal-magnetic release: adjustable overload, fixed short-circuit

Fuse + overload relay combination: older design, still widely used in Indian industry

Key coordination rules:

Overload protection rating ≤ cable current carrying capacity (derated): protects cable from sustained overload

Short-circuit protection must interrupt any fault current before the cable's I²t withstand is exceeded (see short-circuit rating article)

Motor overload relay should be set to 1.05–1.10× motor FLC — not 1.25× (overcurrent, not overload)

For long cable runs, check that the minimum fault current at the cable end is still high enough to trip the protection device

Underground Cables: Additional Considerations

For armoured cables installed underground, additional derating factors apply based on soil thermal resistivity, burial depth, and soil temperature. The method is set out in IS 3961 Part IV. As a conservative rule of thumb, apply an additional 0.80–0.85 derating factor for direct buried armoured cables compared to free-air ratings — but always verify with the IS 3961 tables for your specific conditions.

Summary: The 5-Step Industrial Cable Sizing Process

1. Calculate full load current (FLC) from rated power, voltage, pf, and efficiency

2. Determine derating factors: ambient temperature + grouping (× both together)

3. Divide FLC by combined derating factor → required free-air cable rating

4. Select cable from IS 3961 tables with free-air rating ≥ required rating

5. Verify voltage drop (IS 732 ≤ 5%) and short-circuit withstand — upsize if either fails

Always document your calculation assumptions (ambient temperature, grouping method, derating factors used) — this is required for IS 732 compliance documentation and for future maintenance reference.

Previous Articles

PVC Resin Prices Are Rising — How Iran's Petrochemicals Affect Wire Insulation CostsAluminium Prices Are Up — Why Energy Costs From the Middle East Crisis MatterVoltage Drop Calculation for Long Cable Runs — A Complete Technical Guide

Next Articles

Short Circuit Current Rating of Cables — The Adiabatic Equation ExplainedWire & Cable India 2026 — India's Premier Cable Trade Fair in MumbaiWire Düsseldorf 2026 — The World's Largest Wire & Cable Trade Show

Top Reads

What Is Electricity?What Is Electric Current?What Is Voltage?